OK, descend to 130 feet and spend 8 minutes, ascend to 100 feet and spend 8 minutes, ascend to 70 feet and spend 8 minutes, then ascend for the surface. I used EAN 28 so that the pO2 would be 1.4. Using 40/85, this is a deco dive. Using 45/95, this is arguably a no stop with a safety stop. I think we all get what averaging is, I would not use it on anything that was close to a deco dive, I'll stick with my computer.
MultiDeco 4.10 by Ross Hemingway,
ZHL code by Erik C. Baker.
Decompression model: ZHL16-C + GF
DIVE PLAN
Surface interval = 2 day 0 hr 0 min.
Elevation = 0ft
Conservatism = GF 40/85
Dec to 130ft (2) Nitrox 28 60ft/min descent.
Level 130ft 7:50 (10) Nitrox 28 1.38 ppO2, 116ft ead
Asc to 100ft (11) Nitrox 28 -24ft/min ascent.
Level 100ft 8:00 (19) Nitrox 28 1.13 ppO2, 88ft ead
Asc to 70ft (20) Nitrox 28 -24ft/min ascent.
Level 70ft 8:00 (28) Nitrox 28 0.87 ppO2, 61ft ead
Asc to 30ft (30) Nitrox 28 -24ft/min ascent.
Stop at 30ft 0:50 (31) Nitrox 28 0.53 ppO2, 24ft ead
Stop at 20ft 1:00 (32) Nitrox 28 0.45 ppO2, 15ft ead
Stop at 10ft 3:00 (35) Nitrox 28 0.36 ppO2, 6ft ead
Surface (35) Nitrox 28 -20ft/min ascent.
OTU's this dive: 34
CNS Total: 12.8%
49.7 cu ft Nitrox 28
49.7 cu ft TOTAL
 
DIVE PLAN COMPLETE
DIVE PLAN
Surface interval = 2 day 0 hr 0 min.
Elevation = 0ft
Conservatism = GF 45/95
Dec to 130ft (2) Nitrox 28 60ft/min descent.
Level 130ft 7:50 (10) Nitrox 28 1.38 ppO2, 116ft ead
Asc to 100ft (11) Nitrox 28 -24ft/min ascent.
Level 100ft 8:00 (19) Nitrox 28 1.13 ppO2, 88ft ead
Asc to 70ft (20) Nitrox 28 -24ft/min ascent.
Level 70ft 8:00 (28) Nitrox 28 0.87 ppO2, 61ft ead
Asc to 20ft (30) Nitrox 28 -24ft/min ascent.
Stop at 20ft 0:25 (31) Nitrox 28 0.45 ppO2, 15ft ead
Stop at 10ft 1:00 (32) Nitrox 28 0.36 ppO2, 6ft ead
Surface (32) Nitrox 28 -20ft/min ascent.
OTU's this dive: 34
CNS Total: 12.7%
47.9 cu ft Nitrox 28
47.9 cu ft TOTAL
 
DIVE PLAN COMPLETE