I'll take back everything I said....
The Dredge E.W. Ellefson, a cutter/suction dredge, is expected to remove approximately 191,000 cubic yards of shoaling material from the entrance channel and the settling basins over 2-3 weeks. Operations will continue 24 hours daily, seven days a week, until completion. Dredge material placement will be pumped and screened onto the adjacent beach at Palm Beach Island, immediately south of the inlet’s south jetty.
I should probably quit screwing around with my current career and get on with dredging, where the big money is at.