halocline
Contributor
The "rounding procedure" prepares a hot dipped galvanized cylinder to respond to the actual test. It's not exactly doing it twice but it's a reasonable analogy. Failing to include the rounding step has resulted in unjustified condemnations.
Pete
I know about the rounding procedure as outline in the PST document that's been floating around and is available on the vdh site. This is something different and not manufacturer-driven. Have you ever heard a hydro tester, several of whom have posted on this forum, ever mention anything about doing hydros on all steel tanks twice?