I found this on another forum

The following has just been passed to me which may explain some things (especially whether a liner or full string was run):

This well had been giving some problems all the way down and was a big discovery. Big pressure, 16ppg+ mud weight. They ran a long string of 7" production casing - not a liner, the confusion arising from the fact that all casing strings on a floating rig are run on drill pipe and hung off on the wellhead on the sea floor, like a "liner". They cemented this casing with lightweight cement containing nitrogen because they were having lost circulation in between the well kicking all the way down.
The calculations and the execution of this kind of a cement job are complex, in order that you neither let the well flow from too little hydrostatic pressure nor break it down and lose the fluid and cement from too much hydrostatic. But you gotta believe BP had 8 or 10 of their best double and triple checking everything.
On the outside of the top joint of casing is a seal assembly - "packoff" - that sets inside the subsea wellhead and seals. This was set and tested to 10,000 psi, OK.
This was the end of the well until testing was to begin at a later time, so a temporary "bridge plug" was run in on drill pipe to set somewhere near the top of the well below 5,000 ft. This is the second barrier, you always have to have 2, and the casing was the first one. It is not know if this was actually set or not. At the same time they took the 16+ ppg mud out of the riser and replaced it with sea water so that they could pull the riser, lay it down, and move off.
When they did this, they of course took away ...... hydrostatic on the well. But this was OK, normal, since the well was plugged both on the inside with the casing and on the outside with the tested packoff. But something turned loose all of a sudden, and the conventional wisdom would be the packoff on the outside of the casing.
Gas and oil rushed up the riser; there was little wind, and a gas cloud got all over the rig. When the main inductions of the engines got a whiff, they ran away and exploded. Blew them right off the rig. This set everything on fire. A similar explosion in the mud pit / mud pump room blew the mud pumps overboard. Another in the mud sack storage room, sited most unfortunately right next to the living quarters, took out all the interior walls where everyone was hanging out having - I am not making this up - a party to celebrate 7 years of accident free work on this rig. 7 BP bigwigs were there visiting from town.
In this sense they were lucky that the only ones lost were the 9 rig crew on the rig floor and 2 mud engineers down on the pits. The furniture and walls trapped some and broke some bones but they all managed to get in the lifeboats with assistance from the others.
The safety shut ins on the BOP were tripped but it is not clear why they did not work. This system has 4 way redundancy; 2 separate hydraulic systems and 2 separate electric systems should be able to operate any of the functions on the stack. They are tested every 14 days, all of them. (there is also a stab on the stack so that an ROV can plug in and operate it, but now it is too late because things are damaged).
The well is flowing through the BOP stack, probably around the outside of the 7" casing. As reported elsewhere, none of the "rams", those being the valves that are suppose to close around the drill pipe and / or shear it right in two and seal on the open hole, are sealing. Up the riser and out some holes in it where it is kinked. A little is coming out of the drill pipe too which is sticking out of the top of the riser and laid out on the ocean floor. The volumes as reported by the media are not correct but who knows exactly how much is coming?
2 relief wells will be drilled but it will take at least 60 days to kill it that way. There is a "deep sea intervention vessel" on the way, I don't know if that means a submarine or not, one would think this is too deep for subs, and it will have special cutting tools to try to cut off the very bottom of the riser on top of the BOP. The area is remarkably free from debris. The rig "Enterprise" is standing by with another BOP stack and a special connector to set down on top of the original one and then close. One unknown is if they get a new stack on it and close it, will the pregnant dog broach around the outside of all the casing??
In order for a disaster of this magnitude to happen, more than one thing has to go wrong, or fail. First, a BallS**tty cement job. The wellhead packoff / seal assembly, while designed to hold the pressure, is just a backup. And finally, the ability to close the well in with the BOP somehow went away.
 
What effects will it have over the summer if they can't stop the 200,000 plus gallons a day pouring into the gulf for 3 months?...

No doubt Republicans will be saying that we have lost oil production because of this, so we should sart building more offshore oil rigs in the Gulf.

:shakehead:
 
No, that will the the petroleum speculator's jobs, except instead of calling for more drilling, they will just say that "production is down, therefore the price of oil will, of course, have to go up." Hence prices at the pump will jump 25-40 percent (even though price-per-barrel rises only 12%, and production in the Gulf is practically unaffected--there are over 4000 platforms in the Gulf of Mexico, some of which are natural gas, of course, but I have as yet to hear that production has decreased at all). Bottom line...gasoline prices may very well spike in a similar fashion to the way they did two summers ago, although there is no "mechanical" reason for doing so. If it happens, it will again be the effects of speculation concerning oil futures.
 
No doubt Republicans will be saying that we have lost oil production because of this, so we should sart building more offshore oil rigs in the Gulf.

:shakehead:

I guess that goes for Obama too, who still wants to drill off our Florida coast:shakehead:
 
So far local news reports are saying that there has been very little evidence of oil coming ashore. A local report from marine biologist of dead turtles found on the Mississippi beaches show no evidence of oil.
The first dome is in transit to the site and should be in position Thursday. So far predictions of doom by the sperts have not materialized.
 
Experience gained is in direct proportion to busted [-]toys.[/-] rigs.
 