cfenton
Contributor
I am getting ready to do my Tech 1 course at the end of October/05. Obviously there has been a significant cost in making the transition from my single tank rec. gear to the double tank tech gear. I have a left over Mares 1st stage with a yolk connection. I have recently had it services and have used it on my argon bottle. My question is how important is it to have a DIN connection on this bottle in this range?
Thanks
Thanks