I sat in the garage and knoted up some line to add this coming weekend then survey on the way out but then I realized the existing line needs change of direction AND it is not knoted so it can not be surveyed.
I propose that my team lays in new line beside (starting beside) the existing line, knotted every 10 feet, line arrow every 100 feet and in proper direction, then surveyed, I would post the survey here in this thread.
The problem is with the bottom time it would take to do that dive and the amount of Deco my team will rack up laying in and surveying the line is quite significant so we would not be able to pull the old line out.
The next team would have to go pull the old line out, and I will not be able to make it back to Travis for almost a month after this dive.
Anyway, can't do a survey without knotted line and I figured putting in knotted line would be a lot easer than going out and putting knots on the existing line
Then if anyone adds line to the new knoted line, just be sure to follow the same deal, knot every 10 feet, arrow every 100 then add survey data to existing line plot.
thoughts comments objections?