TDI has recently changed the bailout gas standards for the CCR Mixed Gad Diluent Diver. I am looking at the part
33.11 Required Skill Perfomance...
I see the following 3. Calculate bailout gas at 50 litres /1.8 cubic Feet per minute usage for bottom mix and ascent phase including the first 10 minutes of decompression, and at 25 litres/0.9 cubicFeet per minute for decompression gas(ses) after the end of the first decompression stop.
Is there a shortcut in Multideco that would allow me to predict gas consumption for both the ascent phase and the first 10 minutes of deco or do I have to revert back to the 90s where we hand bombed all the gas consumption calculations?
33.11 Required Skill Perfomance...
I see the following 3. Calculate bailout gas at 50 litres /1.8 cubic Feet per minute usage for bottom mix and ascent phase including the first 10 minutes of decompression, and at 25 litres/0.9 cubicFeet per minute for decompression gas(ses) after the end of the first decompression stop.
Is there a shortcut in Multideco that would allow me to predict gas consumption for both the ascent phase and the first 10 minutes of deco or do I have to revert back to the 90s where we hand bombed all the gas consumption calculations?