Nemrod Snark III Double Hose LP port adaptor?

Please register or login

Welcome to ScubaBoard, the world's largest scuba diving community. Registration is not required to read the forums, but we encourage you to join. Joining has its benefits and enables you to participate in the discussions.

Benefits of registering include

  • Ability to post and comment on topics and discussions.
  • A Free photo gallery to share your dive photos with the world.
  • You can make this box go away

Joining is quick and easy. Log in or Register now!

Look at my first image… the OPV is retained (I just had the cap removed while adjusting the release pressure) the very late Snark IIIs replaced the ‘coin slot’ LP Chamber Plug with a 3/8 LP port adaptor as an OEM feature.
I propose to recreate these adaptors based on measurements from an actual OEM example I finally got hold of.
 
Look at my first image… the OPV is retained (I just had the cap removed while adjusting the release pressure) the very late Snark IIIs replaced the ‘coin slot’ LP Chamber Plug with a 3/8 LP port adaptor as an OEM feature.
I propose to recreate these adaptors based on measurements from an actual OEM example I finally got hold of.
I wasn't referring to yours. I was referring to some regs I have modified repurposing the OPV port. I wanted to emphasize that if the OPV port is converted to a LP port some method of venting excess pressure must be used
 
Sorry, I am just seeing this thread. I would definitely be up for some of those as well.
 
OK quick update...
RFQ back, been sorting out a couple of small technical issues with my supplier.
Like other Poseidon products I've made these will be CNC machined from Naval Brass (~0.8% Tin) for addtional strength and corrosion resistance, then Gloss Electroless Nickel plated for even coverage of the threads.
US$20 each plus shipping... please let me know.
 
I will take 4.

Any idea of when?

Thanks
 
Thanks @Luis
I haven't put the order in yet, but I should do so by cob today, turnaround is usually pretty quick so around 10 days (plating is done by a separate supplier).
 
I'll take 3
 

Back
Top Bottom