Very unlikley that all renovations will be completed by carnival.
Work so far is mostly exterior, although a few rooms on the top floor are nearing completion.
Outside, pool has been painted, small sand area constructed and enclosed, natural wood partitions & drying rack on built porches & fresh thatching installed & the like.
Redone rooms have that big tub that is so ideal for rinsing gear removed and an attractive shower installed. Slipperly tile removed from floor and replaced with an adbode type covering that includes a small stone mosaic. Fresh paint & free in-room safes due to be put in soon.
It is still open & operating, and still a super deal.
Best regards.
DocVikingo