Legit question, do you charge by the actual Cu Ft used to fill or the rated Cu Ft of the cylinder?At My shop we charge by the cu.ft. for all our gasses; we fill all tanks in a water bath @70f to pressure and tank is not released back to customer until the tank is at desired psi and it is @70f +/-5. An AL80 takes about 28min. Steels take a little longer as they take longer to dissipate the heat from filling. All our banks air and 36%are at 5k and can fill up to 5 tanks at a time.