I am now one step closer to completing the baby doubles (for my double hose reg) that I've posted about in several threads: I ordered (from Grainger dot com) and earlier today received the "Binding Posts" that thread onto the carriage bolts that pass through the tank bands.
I drilled larger the holes in my back plate, but I still need to cut down the carriage bolts (a bit too long). This is where things stand do far:
ETA: I posted about the harness (Post #5) here: Twin 45's back from Hydro and valves/manifold rebuilt.
ETA: And I posted about the manifold (Post #43) and the bands (Post #47) here: Twin Set Considerations/ Manifold.
rx7diver

I drilled larger the holes in my back plate, but I still need to cut down the carriage bolts (a bit too long). This is where things stand do far:
ETA: I posted about the harness (Post #5) here: Twin 45's back from Hydro and valves/manifold rebuilt.
ETA: And I posted about the manifold (Post #43) and the bands (Post #47) here: Twin Set Considerations/ Manifold.
rx7diver


