lionfish-eater

ScubaBoard Supporter
ScubaBoard Supporter
Messages
5,317
Reaction score
7,365
Location
On an Island in the Mississippi River
# of dives
200 - 499
If you build it, they will come.

[TABLE="width: 640"]
[TR]
[TD="align: left"]Friday started construction of pier[/TD]
[/TR]
[TR]
[TD]


COZUMEL, 7 July.- be Friday July 10 when the state governor Roberto Borge Angulo, perform the checkered flag for the start of construction of the building annex berth for boats to dock San Miguel, work is expected to have surpassing the 14 million pesos investment. And platforms are standing right next to the sea terminal, which causes curiosity among the community.
Since last weekend, the islanders expressed in social networks on concern about the placement of what looked like huge trailers or wagons placed in the parking lot of the famous "ramp", located off Sedena, however, for this Tuesday armed with a platform that was moved to the side of the main pier at dawn was concluded.
This platform will be used to begin construction berth so that will be interconnected, as will be seen in the graphically, same that will be linked to the mainland dock users annexed to San Miguel in a construction area of 286.13 thousand springs square meters and about three thousand 628.37 the mirror of water to add four thousand total 914.50 square meters.
It let them know from within the Port Authority of Quintana Roo (Apiqroo), will be this Friday morning when the chief executive, Roberto Borge Angulo, perform the checkered flag to start these works presumed, are included the management plan to allow for improvements in the service users and owners of vessels.
It is intended to build a dock that hosts yachts of important dimensions, allowing passengers enjoy in the town for several days, as they descend to go snorkeling, diving and other activities, contemplating a capacity of about 40 vessels between 30 and 40 feet long.
This construction would go hand in hand with a project that has the current Marrufo administration headed by Fredy Martin, which is the modernization of the historic center of Cozumel, anticipating that the dock could be assembled with the Benito Juarez park and surrounding areas, considering future one work for the center is in harmony with the building of other businesses.
Today, about 25 applications were recorded for luxury yachts dock in the port facilities dock San Miguel, however, it has not been possible for the operation of the federal roads therefore It has considered this construction which is expected to come to give a further boost to the economy Cozumeleños.

[/TD]
[/TR]
[TR]
[TD][/TD]
[/TR]
[/TABLE]
 
If you build it, they will come.

[TABLE="width: 640"]
[TR]
[TD="align: left"]Friday started construction of pier[/TD]
[/TR]
[TR]
[TD]


COZUMEL, 7 July.- be Friday July 10 when the state governor Roberto Borge Angulo, perform the checkered flag for the start of construction of the building annex berth for boats to dock San Miguel, work is expected to have surpassing the 14 million pesos investment. And platforms are standing right next to the sea terminal, which causes curiosity among the community.
Since last weekend, the islanders expressed in social networks on concern about the placement of what looked like huge trailers or wagons placed in the parking lot of the famous "ramp", located off Sedena, however, for this Tuesday armed with a platform that was moved to the side of the main pier at dawn was concluded.
This platform will be used to begin construction berth so that will be interconnected, as will be seen in the graphically, same that will be linked to the mainland dock users annexed to San Miguel in a construction area of 286.13 thousand springs square meters and about three thousand 628.37 the mirror of water to add four thousand total 914.50 square meters.
It let them know from within the Port Authority of Quintana Roo (Apiqroo), will be this Friday morning when the chief executive, Roberto Borge Angulo, perform the checkered flag to start these works presumed, are included the management plan to allow for improvements in the service users and owners of vessels.
It is intended to build a dock that hosts yachts of important dimensions, allowing passengers enjoy in the town for several days, as they descend to go snorkeling, diving and other activities, contemplating a capacity of about 40 vessels between 30 and 40 feet long.
This construction would go hand in hand with a project that has the current Marrufo administration headed by Fredy Martin, which is the modernization of the historic center of Cozumel, anticipating that the dock could be assembled with the Benito Juarez park and surrounding areas, considering future one work for the center is in harmony with the building of other businesses.
Today, about 25 applications were recorded for luxury yachts dock in the port facilities dock San Miguel, however, it has not been possible for the operation of the federal roads therefore It has considered this construction which is expected to come to give a further boost to the economy Cozumeleños.
[/TD]
[/TR]
[TR]
[TD][/TD]
[/TR]
[/TABLE]
Where is it, exactly? From this "translated" account and others I have gathered that it will be to the south of the ferry pier (the one at the end of Benito Juarez), between it and the Navy pier. Is that correct?
 
Seems like a terrible way to do a dock for large sail boats/yachts/boats that is completely open to the ocean/waves with no break water or protection.......

You get an El Norte in with 5+ foot seas and it will tear that up and any boats tied up there.

Let alone a hurricane or close hurricane.
 
The new dock is just north of the town, on the boat ramp, across from the Sedena store. I thought it was supposed to be as a place for locals to tie up after trailer launching their boats. I agree, that the drawing shown would be blown apart in the first serious norte if that is the same dock. But I suspect not, that drawing looks like old plans to place a small yacht basin in the lee of the ferry pier…that would make sense for visiting yachts, and draw more of them.

Dave Dillehay
Aldora Divers
 
Last edited:
The new dock is just north of the town, on the boat ramp, across from the Sedena store. I thought it was supposed to be as a place for locals to tie up after trailer launching their boats. I agree, that the drawing shown would be blown apart in the first serious norte if that is the same dock. But I suspect not, that drawing looks like old plans to place a small yacht basin in the lee of the ferry pier…that would make sense for visiting yachts, and draw more of them.

Dave Dillehay
Aldora Divers

I thought that too, but I heard they drove the crane onto a barge and it is really all about building an extension off the people ferry pier for boats. The area by the military base was supposedly just the staging area. That is also what the article posted says as well.
 
The new piers will be built just to the south of the Muelle Fiscal (passenger ferry pier) and just north of the large Mexican flagpole. I saw the engineers doing the geological survey of the bottom some time ago. Monday, the crane barge was pushed into position and a scaffolding dropped into place in the water, so the work can begin.
 
  • Like
Reactions: JFS
The new piers will be built just to the south of the Muelle Fiscal (passenger ferry pier) and just north of the large Mexican flagpole. I saw the engineers doing the geological survey of the bottom some time ago. Monday, the crane barge was pushed into position and a scaffolding dropped into place in the water, so the work can begin.
This makes more sense and matches with what was being talked about last fall when the square project was started. I was skeptical last fall when the square renovation started but now that it has opened up with the synchronized fountains, I am impressed. Hopefully the new pier project will turn out as well.
 
I was skeptical last fall when the square renovation started but now that it has opened up with the synchronized fountains, I am impressed.

Aren't there fountains covered over at the Palacio. Gee, you are easy...... :)
 
I still maintain without any breakwater - the first big norte will pulverize it.....hurricane or TS comes near and it will be a new reef to dive lol.
 
Aren't there fountains covered over at the Palacio. Gee, you are easy...... :)

These work. Had a great time watching the little kids playing in them. They place cups over the holes and since they do not which hole will fire next its a great guessing game for them to see who's cup if fired into the air next.
 