Ah, the Law of Unintended Consequences, lol!Thanks for the spreadsheet!
Question on the Ascent Calc#1:
Shouldn't the ascent time depended upon the ascent rate (which may not be a constant of 60 ft/min)?
In other words: =IF(B6>60,(B6-60)/B9,"") instead of =IF(B6>60,(B6-60)/60,"")
I would like to be safer by going at 30 ft/min ascent rate, which would take longer time to ascend and be using more gas, hence, higher rock bottom pressure.
Another SB Buddy made the excellent suggestion to make deep ascent rate user adjustable, because not everyone will be comfortable with a 60fpm ascent from deep to 60'. But I neglected to change the accompanying formula. Thanks for your attention to detail!
To all who have downloaded the spreadsheet:
Please go back to Post #1 and retrieve RockBottomPressure4.xlsx instead.
Thanks for your interest!