namelz52:
V-Planner 3.32 by R. Hemingway, VPM code by Erik C. Baker.
Assuming .5cf/m SAC...........
Decompression model: VPM-B
DIVE PLAN
Surface interval = 2 day 0 hr 0 min.
Elevation = 0ft
Conservatism = + 2
Dec to 100ft (2) on Nitrox 23.0, 50ft/min descent.
Level 100ft 255:00 (257) on Nitrox 23.0, 0.93 ppO2, 97ft ead
Asc to 50ft (258) on Nitrox 23.0, -30ft/min ascent.
Stop at 50ft 11:20 (270) on Nitrox 23.0, 0.58 ppO2, 48ft ead
Stop at 40ft 30:00 (300) on Nitrox 23.0, 0.51 ppO2, 38ft ead
Stop at 30ft 47:00 (347) on Nitrox 23.0, 0.44 ppO2, 28ft ead
Stop at 20ft 80:00 (427) on Nitrox 23.0, 0.37 ppO2, 19ft ead
Stop at 10ft 148:00 (575) on Nitrox 23.0, 0.30 ppO2, 9ft ead
Asc to sfc. (575) on Nitrox 23.0, -30ft/min ascent.
Off gassing starts at 72.2ft
OTU's this dive: 228
CNS Total: 79.9%
771.4 cu ft Nitrox 23.0
771.4 cu ft TOTAL