rescue15
Contributor
OK, I have 5 requests. I will get the prices for the materials this week and let everyone know by PM. I will send payment information to everyone and when I receive ALL payments, I will purchase the materials and start production. The biggest hold up once I get the money is the turnaround time for the lids. That is totally dependant on how busy the CNC shop is. For my last run I had all the canisters ready for shipping before the lids were complete. Everyone was patient and understanding and everyone got what they paid for. I think it was within 14 days of them sending payment.
If anyone wants an extra lid in case of screw ups or multiple configurations, let me know and I can give you a quote on the lids as well.
Also, I would be willing to work out a deal if someone would want to trade a canister for building the circuitry. ( I would like a 700 lumen or greater led set up with a reed switch and reflector that would fit into a D cell mag light that would run on 12v - preferable or 14.8v battery).
Thanks,
Steve
If anyone wants an extra lid in case of screw ups or multiple configurations, let me know and I can give you a quote on the lids as well.
Also, I would be willing to work out a deal if someone would want to trade a canister for building the circuitry. ( I would like a 700 lumen or greater led set up with a reed switch and reflector that would fit into a D cell mag light that would run on 12v - preferable or 14.8v battery).
Thanks,
Steve