FYI: A new power plant has been built on the island and is located up close to the BOPEC terminals. The power lines from this station back to civilization (term used loosely) are underground. The power company decided to have the lines follow along the short cut road that leads over the top of the ridge line (past/under the radio transmission towers).
In that regard the road has been vastly improved to allow access to utility vehicles.