HI Mike,
Nice system you have as I've seen some pictures from another post. With the Tri hunter system you will need none of the following items from the O2 bottle. The regulator,solenoid valve, check valve, needle valve and pressure gauge can go. This is do to the the Tri hunter will come with new regulators for O2 and HE. The solenoid vlave and needle valve are built into the control unit. The tri hunter will watch the O2 and shut the O2 off if you run more than 39 percent. It also wires into the compressor and turns the O2 off it the compressor quits. You don't need the down stream O2 prssure gauge as the control until is reading the nitrox mix live and you adjust your mix with the built in needle valve. This would be the same for the HE if you use it. I do run a down stream analizer myself to double check the control box.
Here's a couple pictures of my system I build.
---------- Post added at 12:47 AM ---------- Previous post was at 12:19 AM ----------
Mike another thing I see is you have a check valve going into the bank. How are you going to get the air from the bank back out to the manifold. This is why I ran two manifolds. The lines from the compressor in the air system are checked going into my four air banks. Also my fill manifold has check valves in them as I have air, nitrox and HE all on one manifold. My four nitrox banks on the fill side I removed the check valves. This is so I can open all the bank and let them equalize. By doing this I can keep the mix the same in all banks. [/QOUTE]
Awesome catch

I am waiting on my new manifold so I can come out the other side as I suspect you are doing. I just have gotten busy at work so my bank still is not commissioned. I also need to secure it as I am still waiting on my floor rack to ship.
Also if you look above my bank bottles I have shut off valves there. It does two thing. If a line broke I could shut down many bottles in a quick turn of the valve. It also is an extra shut off I use when running the compressor. So if I make air there are two nitrox valve shut off. This is a second back up to the first valve so air might not leak by. With the extra shut off I can run from the compressor straight thru to the front fill line. Great for running tri-mix fills.
The alumium box under the fill panel is a water box I made. I had the inside line-x inside. It can hold two set of doubles at a time. As for fill wip I have made a custom proable mainifold station that can fill 8 bottles at a tine. I just clip one of my fill line into it and I'm ready.
Thank you very much for the tips as your system was the model I was going after. Super clean, functional, and done properly. Thank you!!!