MK17/G250V hose connectors

Please register or login

Welcome to ScubaBoard, the world's largest scuba diving community. Registration is not required to read the forums, but we encourage you to join. Joining has its benefits and enables you to participate in the discussions.

Benefits of registering include

  • Ability to post and comment on topics and discussions.
  • A Free photo gallery to share your dive photos with the world.
  • You can make this box go away

Joining is quick and easy. Log in or Register now!

vixtor

Contributor
Messages
490
Reaction score
32
Location
Bucharest, Romania
# of dives
200 - 499
Hello,

Now that the Miflex HP hose is available, I intend to switch all my hoses to Miflex. I see that for the regulator, two versions are available:
- 3/8" M UNF x 9/16" F
or
- 1/2" M UNF x 9/16" F

Which one is the right one for MK17/G250V?
 
Remove both the primary hose and octo hose from your first stage. If the male threads are the same size then you need the 3/8" hose. If the primary thread is bigger, than you need the 1/2" hose. I've only rebuilt a couple of Mk 17s but I don't remember any Scubapro first stages having a 1/2" primary hose.

Hope this helps some.
 
https://www.shearwater.com/products/perdix-ai/

Back
Top Bottom