Paul Evans
"Mr Mares"
..... I don,t, but i know a guy who does
So this is the problem, at the edge of the lake (20 Acres), British acres, ( I don,t want to get into the metric - imperial debate again).
There is a 30 degree bank down to water level, No problem.
From there the lake decends at 1m in depth for every 2m in distance from the shore.
So it would be ideal at 4m depth to practise GS entry, this is 8m out :11:
How do I build a pier from the bank 8m out, which has to stable (for students) and long lasting.
This is my idea
1. construct 8ft * 8ft scafollding frames, deck with scaffolding planks and float each on 1ft thick polystyerene blocks
2. Keep doing this until you are the correct distance, or greater, out from the bank.
3. the first landing stage would be custom made on posts to acommadate the bank and connection to the first floating frame.
Anybody see anything wrong with this????
So this is the problem, at the edge of the lake (20 Acres), British acres, ( I don,t want to get into the metric - imperial debate again).
There is a 30 degree bank down to water level, No problem.
From there the lake decends at 1m in depth for every 2m in distance from the shore.
So it would be ideal at 4m depth to practise GS entry, this is 8m out :11:
How do I build a pier from the bank 8m out, which has to stable (for students) and long lasting.
This is my idea
1. construct 8ft * 8ft scafollding frames, deck with scaffolding planks and float each on 1ft thick polystyerene blocks
2. Keep doing this until you are the correct distance, or greater, out from the bank.
3. the first landing stage would be custom made on posts to acommadate the bank and connection to the first floating frame.
Anybody see anything wrong with this????