Could you please explain in details how to vent the first stage attached to a bottle?
Not a stupid question at all-this question turns up often in this forum, so it occurs more often than one would think. Fortunately, piston regulators are very forgiving when it comes to water intrusion-especially clean fresh water.
Use gravity and pressure to your advantage. With your MK 25 attached to the tank with the low pressure ports down, the spg and second stages removed, plug all the ports except one hp port. A couple of easy, short bust of air through that port is all you need before plugging it and moving on to the other hp port where you will repeat the process. After you've cleared the hp section, move down to the lp ports each in their turn, in any order, except leave the end cap port for last.
You'll probably want to dry out your SPG hose by removing the gage and spool from the fitting and blow air through the bare hose after the above procedure.
Long purges of the second stages are all that are required.
Finish by leaving all the ports unplugged and allow to air dry before storing.
Couv
Last edited: