benjammin17
Registered
I am giving subsurface a test and in comparing it to multideco I noticed that there is a huge difference between the two for what should be the same dive plan. The stops and runtime are very different. Did I miss a setting or something along the way? Any thoughts on why there is that much difference?
I put a dive into both for 120ft using 30% and 100% and a time of 60 min. Both have last stop at 20ft, ZHL16-C at 40/70, fresh water, 30ft/m ascent, 60ft/m descent.
Multideco:
Decompression model: ZHL16-C + GF
DIVE PLAN
Surface interval = 5 day 0 hr 0 min.
Elevation = 0ft
Conservatism = GF 40/70
Dec to 120ft (2) Nitrox 30 60ft/min descent.
Level 120ft 58:00 (60) Nitrox 30 1.36 ppO2, 102ft ead
Asc to 50ft (62) Nitrox 30 -30ft/min ascent.
Stop at 50ft 1:40 (64) Nitrox 30 0.74 ppO2, 40ft ead
Stop at 40ft 6:00 (70) Nitrox 30 0.65 ppO2, 32ft ead
Stop at 30ft 12:00 (82) Nitrox 30 0.57 ppO2, 23ft ead
Stop at 20ft 25:00 (107) Oxygen 1.59 ppO2, 0ft ead
Surface (107) Oxygen -30ft/min ascent.
OTU's this dive: 149
CNS Total: 77.1%
Gas density: 5.5g/l
218.6 cu ft Nitrox 30
24.0 cu ft Oxygen
242.6 cu ft TOTAL
Subsurface:
Subsurface (4.9.6.0) dive plan (surface interval 1:00) created on 9/1/20
Runtime: 75min
depth duration runtime gas
➘ 120ft 60min 60min EAN30
➚ 30ft 3min 63min
- 30ft 2min 65min
➚ 20ft 0min 65min
- 20ft 9min 74min oxygen
➚ 0ft 1min 75min
CNS: 36%
OTU: 65
Deco model: Bühlmann ZHL-16C with GFLow = 40% and GFHigh = 70%
ATM pressure: 1,013mbar (0ft)
Gas consumption (based on SAC 0.70|0.60cuft/min):
127cuft/2,097psi of EAN30 (9cuft/142psi in planned ascent)
— Minimum gas (based on 3.0xSAC/+4min@120ft): 66cuft/
I put a dive into both for 120ft using 30% and 100% and a time of 60 min. Both have last stop at 20ft, ZHL16-C at 40/70, fresh water, 30ft/m ascent, 60ft/m descent.
Multideco:
Decompression model: ZHL16-C + GF
DIVE PLAN
Surface interval = 5 day 0 hr 0 min.
Elevation = 0ft
Conservatism = GF 40/70
Dec to 120ft (2) Nitrox 30 60ft/min descent.
Level 120ft 58:00 (60) Nitrox 30 1.36 ppO2, 102ft ead
Asc to 50ft (62) Nitrox 30 -30ft/min ascent.
Stop at 50ft 1:40 (64) Nitrox 30 0.74 ppO2, 40ft ead
Stop at 40ft 6:00 (70) Nitrox 30 0.65 ppO2, 32ft ead
Stop at 30ft 12:00 (82) Nitrox 30 0.57 ppO2, 23ft ead
Stop at 20ft 25:00 (107) Oxygen 1.59 ppO2, 0ft ead
Surface (107) Oxygen -30ft/min ascent.
OTU's this dive: 149
CNS Total: 77.1%
Gas density: 5.5g/l
218.6 cu ft Nitrox 30
24.0 cu ft Oxygen
242.6 cu ft TOTAL
Subsurface:
Subsurface (4.9.6.0) dive plan (surface interval 1:00) created on 9/1/20
Runtime: 75min
depth duration runtime gas
➘ 120ft 60min 60min EAN30
➚ 30ft 3min 63min
- 30ft 2min 65min
➚ 20ft 0min 65min
- 20ft 9min 74min oxygen
➚ 0ft 1min 75min
CNS: 36%
OTU: 65
Deco model: Bühlmann ZHL-16C with GFLow = 40% and GFHigh = 70%
ATM pressure: 1,013mbar (0ft)
Gas consumption (based on SAC 0.70|0.60cuft/min):
127cuft/2,097psi of EAN30 (9cuft/142psi in planned ascent)
— Minimum gas (based on 3.0xSAC/+4min@120ft): 66cuft/