Can anyone point me to step-by-step instructions for the DIR-sanctioned way of attaching bolt snaps to the primary second stage and SPG?
I've already had the experience of tying a bolt snap to a backup light, following this procedure: https://www.divegearexpress.com/library/boltsnap.shtml. But I'm not certain how to extrapolate that into attaching one to a hose.
I found this description that was posted in an old SB thread: How to tie the perfect boltsnap at Wreck and Cave. If this is the proper way, do I do it exactly the same way on both the primary second stage hose and SPG hose?
I'll be taking GUE Fundies at some point and don't want the instructor to tell me I've got it wrong.
I've already had the experience of tying a bolt snap to a backup light, following this procedure: https://www.divegearexpress.com/library/boltsnap.shtml. But I'm not certain how to extrapolate that into attaching one to a hose.
I found this description that was posted in an old SB thread: How to tie the perfect boltsnap at Wreck and Cave. If this is the proper way, do I do it exactly the same way on both the primary second stage hose and SPG hose?
I'll be taking GUE Fundies at some point and don't want the instructor to tell me I've got it wrong.