Complete Air/OCA/Nitrox/Trimix fill station including:
- 8.4 CFM, 5000 PSI Alkin W32 Mariner compressor with 7.5 HP, 230 volt, single phase motor (standard household power) and refillable breathing air filter (also can use LF cartridges). This compressor is built around a heavy cast iron pump that closely resembles the Bauer Mariner. [http://www.airetex.com/w32m.php];
NOTE: Alkin/Airetex do not void the compressor warranty for continuous blending or pumping of banks as many other manufacturers do. [seehttp://www.airetex.com/faq.html]
- LMNT Nitrox/Trimix continuous blender with O2 & helium regulators and interconnected with compressor for failsafe shutoff [http://www.nitrox-trimix.com/king.asp];
- HyperFiltration (dual stage) for O2 compatible air (deco mixes and maintaining O2 clean cylinders);
- three DIN whips with yoke adapters (one is O2 clean coming off hyper filtration);
- misc connection tubing, fittings, gauges, and valves to complete the system;
- approx. 3 gallons of Chemlube 751.
System has only 200 hours; all of which are my gently used and well maintained hours as I purchased everything new. Never used to pump high pressure banks, i.e. no running at pressures over 3700 psi. Approx. $15K invested, $8500 (pickup only in Hershey, PA).
- 8.4 CFM, 5000 PSI Alkin W32 Mariner compressor with 7.5 HP, 230 volt, single phase motor (standard household power) and refillable breathing air filter (also can use LF cartridges). This compressor is built around a heavy cast iron pump that closely resembles the Bauer Mariner. [http://www.airetex.com/w32m.php];
NOTE: Alkin/Airetex do not void the compressor warranty for continuous blending or pumping of banks as many other manufacturers do. [seehttp://www.airetex.com/faq.html]
- LMNT Nitrox/Trimix continuous blender with O2 & helium regulators and interconnected with compressor for failsafe shutoff [http://www.nitrox-trimix.com/king.asp];
- HyperFiltration (dual stage) for O2 compatible air (deco mixes and maintaining O2 clean cylinders);
- three DIN whips with yoke adapters (one is O2 clean coming off hyper filtration);
- misc connection tubing, fittings, gauges, and valves to complete the system;
- approx. 3 gallons of Chemlube 751.
System has only 200 hours; all of which are my gently used and well maintained hours as I purchased everything new. Never used to pump high pressure banks, i.e. no running at pressures over 3700 psi. Approx. $15K invested, $8500 (pickup only in Hershey, PA).