stackermts
Registered
Asking $700 USD for both first and second stages.
I bought them new in April or May of 2010. I've serviced them about every 9 months. The last servicing was September 2012. Hoses and SPGs not included. Refer to attached photos.
I bought them new in April or May of 2010. I've serviced them about every 9 months. The last servicing was September 2012. Hoses and SPGs not included. Refer to attached photos.